Our Methodology
|
 |
|
We
provide competent and experienced people, who apply well
defined and robust processes, while simultaneously and utilising innovative and
practical tools and techniques. A project can be divided
into 5 distinct project phases:
- Definition
- Approval
- Planning
- Execution
- Close out
For each phase in a project, Èpeus offers custom
services that have been specifically designed to
optimise project management.
|
 |

“Define Your Success”
 |
Èdge Enhancer has been designed to
provide a platform for delivering a successful project.
It is a way to define project parameters and of
demonstrating your ability to deliver within them. It
provides concise information about the project allowing
a more informed decision making process during project
approval. The solution identifies and quantifies major
risks to project success allowing the depiction and
demonstration of the most probable delivery date and
cost at a very early stage of the project. It answers
the three key questions:
- How much will the project cost?
- How long will it take?
- What are our chances of
delivering successfully?
What’s Included?
- Work Breakdown Structures (WBS)
- Cost
Breakdown Structures (CBS)
- High level scope of Work development
- Technical
feasibility and concept verification
- HSE evaluation and planning
- Project
strategy development
- High Level Schedule development
- Qualitative and
quantitative risk assessment and profile analysis
- Knowledge transfer management
|
 |

“Examine to Succeed ”
|
The È-value-ator solution provides a
means to independently evaluate the key contractor’s and
critical equipment supplier’s ability to deliver. Our
Project Specialists will visit and review their plans
and schedules to identify potential impacts to the
overall project. This solution has been designed to be
implemented as part of the tender evaluation process. It
provides vital planning and decision making information.
What’s Included?
- Technical evaluation
- Schedule and resources evaluation
- Risk evaluation
- Commercial evaluation
|
 |

“Plan to Succeed” |
The Success Ènabler solution is a
service that adds extra dimensions to the Èdge Enhancer.
It provides identification, quantification and analysis
of potential overall cost impact factors based on
project execution aspects such as:
- Individual cost influencing elements
- Time influencing elements
- Quality
influencing elements
The Success Ènabler is a method that helps to
reach the goal of zero cost impacts, zero time impacts
and zero defects by identifying management, mitigation
and contingency activities. It will reduce the potential
of the influencing elements occurring and limiting their
impact on the overall cost of the project thus enabling
successful completion of the project
What’s Included?
- Detailed scope of work development and validation
- Detailed budget development
- Detailed schedule development
- Detailed project risk assessment
- Development of a
project execution and controls plan
- Basis of design (Concepts) reviews
- Detailed
engineering management PEER reviews
- Technical risk evaluation
- Compliance project
assurance
- Contract development and review
- Project purchasing and tender
management
- Identification and implementation of key performance indicators
- Knowledge transfer management
|
 |

“Manage for success”
|
Our Success Ènsurer solution assures
the effective management of the execution phase of the
project. It continually and independently monitors the
overall project cost and schedule influencing factors
empowering the project team to focus on the job in hand.
Our Project Specialists will
periodically evaluate the effectiveness of the project
team’s level of implementation of processes, PECP,
impact reducing mitigation and management activities.
This solution will also reduce late delivery of critical
equipment.
Our Project Specialists build on the
benefits of the È-Value-ator service monitoring and
evaluate key suppliers during their manufacturing,
fabrication and assembly processes.
Our internationally located Project
Engineers will attend and report on Factory Acceptance
Testing at international supplier’s and manufacturer’s
sites.
Our Construction Supervisors and
Quality Assurance/ Quality Control personnel will
realise the project zero defect target.
Our Cost and Planning Engineers
enhance the teams’ ability to control and monitor
project costs and schedule
What’s Included?
- Site management Contract administration
- Risk mitigation, management and
contingency implementation
- Technical authority change control co-ordination
- Global procurement and expediting management
- Project document and data control
- Project compliance assurance
- Construction supervision
- Progress and productivity
verification and reporting
- Project Assurance including KPI measurement
- Knowledge
transfer management
|
 |

“Energise your start up” |
The management of phase changes
throughout the project is critical to the success of the
project. Our Ènergizer solution provides a means to plan
and manage the crucial final phases of the project.
A project can begin with the
execution phase followed by the mechanically complete
phase, the pre-commissioning phase, the commissioning
phase and ends with the handover and start up of
operations phase.
Our team of project specialists will
plan and manage the process through the commissioning
and start up phases.
What’s Included?
- Definition of
requirements
- Commissioning planning
and procurement
- Start-up planning and
procurement
- Activity scheduling
- Specific commissioning
and start up risk evaluation
- Commissioning and
start-up management and supervision
- Facility work up and
Handover
|
 |

“Close out for Continual Improvement”
|
Capturing what went right and what
went wrong during a project and having tools and
techniques to analyse this data is vital for continual
project improvement. Utilizing analysed
information to improve processes and techniques is
essential. Hindsight can be a great educator and our Èdge-ucator solution is a service designed to ensure
that critical lessons learned are captured. This is
analysed and reported in a format which will enable
knowledge transfer from project to project.
Due to the temporary nature of
projects, project personnel are quickly dispersed during
the close out phase, this phase is also often the
busiest for the project teams.
Our independent Project Specialists
use our specifically designed data gathering tool to
collect key performance information and analyse the data
against pre-determined and agreed criteria.
Our service allows the project team
to focus on the delivery of the project, collect and
analyse lessons while maintaining flexibility of
staffing levels.
What’s Included?
- Capturing what went well
and not so well on the project
- Analysis of post project
risk and impact profile and effectiveness of
approach
- Presentation of data in a
format that can be used for the continued
improvement in project management and continually
increase the probability of successful completion
- Develop As Built drawings
- Compile project close out
report and documentation
|
|
|
|
|
| |
|